Atriums and façades are different jobs
Atrium and corridor work has to stay clear of shopfronts and fire exits, usually before opening or after close. A west or south façade cannot share an irrigation timer with a shaded wall. After a typhoon the fixings are checked. Dead patches show immediately where footfall is high.